Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Unit 4, 12 Cowcher Place, Belmont
Western Australia
Australia

(08) 9340 590

PACT offers a full range of design, construction and project management services for multi-level commercial and residential projects. A 'whole of project' service, including managing the documentation of the project brief, creating project concepts, setting budgets against project concepts to set feasibility outcomes, ensuring initial design briefs and feasibilities are met, and of course delivering the project.

Projects

Forrestdale South West Primary School - Stage 2

Corlia Mann

Address: Aspiri Promenade, Forrestdale
Project Value: $11.5 million
Estimated Completion Date: November 2018
Architects: Oldfield Knott

Forrestdale Primary School is the second stage of the school development in Piara Waters. The first stage being forward works for Stage 2 and a Kindy were completed by others. The stage 2 primary school site is 26000m2 and works involve the construction of 8 single storey buildings that are concrete ground slab and structural steel frame with face brick external wall and metal deck roof cover.

All internal walls are light steel stud framed and lined in plasterboard with the only exception
being toilet walls which are brick and plaster. The 8 buildings are a central administration
building, a covered assembly, a library and 5 teaching blocks. The buildings are based on the standard pattern design that Department of Education and BMW have adopted in recent times for new government schools.

The balance of the works being undertaken are external hard and soft landscaping. The hard
landscaping works comprise a school carpark, a sports courts, bike rack area, additional car
bays to surrounding roads to create kiss and drop areas, interlinking paved pathways between buildings and general play equipment/areas. The soft landscaping works comprise a bore for irrigation, irrigation, large open grassed areas and some smaller planted out garden areas.

Inner City College Stage 1 - Forward Works

Keeley Allsop

Address: Kitchener Park surrounded by Coglan, Roberts and Subiaco Rd
Project Value: $4.4M excl GST
Estimated Completion Date: 20th June 2018
Architect: T & Z Architects

 

The project consists of two separate elements of works, initially what is known as the Enabling Works, and secondly the Forward Works.

The Enabling Works requires the disconnection of existing and installation of new services to both Subiaco Oval and the existing West Coast Eagles and West Aust Football Commission offices. The new services are installed within a new easement created outside of the Inner City College site.

This provides a new boundary and makes more land available for the new schooling development. The works required to allow this to occur are sequential and also require the existing services to be maintained and kept operational, a particularly difficult task. Along with the services items, access is required to be provided to both of the existing tenants noted above.

Demolition of ramps, gymnasium, players lounges are required prior to the new services being installed. On completion of the above, the Forward works can commence which entails new piling and earthworks within the newly created site boundaries. The overall duration of the project is 16 weeks.

Faulkner Civic Centre

Keeley Allsop

Address: 215 Wright Street, Belmont
Project Value: $37 million
Estimated Completion Date: December 2019
Architect: Bollig Design Group

The proposed Faulkner Civic Centre is a new community facility for Belmont Council and is located at the junction of Wright Street and Progress Way, Belmont, WA. The project involves the construction of a multi-functional community centre development with associated car parking. The complex incorporates a single car park at basement level with associated stores, with the remaining 3 storeys containing a cafe, library, senior citizens facility, demonstration area, museum, crèche, Not-for-Profit tenancy offices plus various back of house facilities.

The built form comprises of a raft basement slab with insitu concrete columns & walls, the upper floors will be insitu concrete columns & beams with pre-cast concrete floors, structural steel columns for the façade and structural steel roof with metal roof sheeting. The external cladding is a mixture of finishes (metal, timber, shingle cladding) to highlight the high level of design. Due to the location and design of the project, dewatering is required for the construction of the basement.

There are also external works for the building, with a Western Power substation, pump room & tank enclosure, bin store, sub-surface services and extensive hard and soft landscaping to integrate the new to existing buildings and surrounding parks.

The Camfield

Keeley Allsop

PACT Construction has been awarded the contract for the redevelopment of the Burswood Park Golf Clubhouse .

Set within Optus Stadium on the picturesque Burswood Peninsula, the project will see PACT redevelop the existing Burswood Park Golf Course facilities into an all-new multi-purpose entertainment venue for Riverbridge Hospitality Pty Ltd. Once complete, the new facility will cater for up to 2,500 people and play an integral role catering for patrons attending events at Optus Stadium and the surrounding Stadium Park.

Read More

Byford Secondary College Stage 3

Corlia Mann

Located on the corner of Abernethy Road and Gordin Way, this bold new architectural school design will bring much needed facilities for Byford’s senior students and its growing population.

Byford Secondary School Stage 3 comprises of a 4,200m2 two storey building that integrates beautiful design with functionality that flows through the general and business studies learning areas, IT laboratories, tiered lecture theatre to seat 125 people, student services, and staff collegiate areas, complemented by extensive landscaping works and all new car parking.

Read More

650 Albany Highway

noni clark

650 Albany Highway Apartments is a 5508m2 multi residential development located at the corner of Albany Highway and Miller Street, East Victoria Park. 
The project involves the construction of a 6 level apartment building with 101 apartments and associated parking that will incorporate a swimming pool, cabana and gym on the first floor.  A common outdoor area on level 5 will showcase a BBQ area, hard and soft landscaping with the aim to create an exciting urban lifestyle experience for residents.

Read More

Momentum Apartments

noni clark

Designed by the world-renowned Woods Bagot Architects, Momentum Apartment consists of 112 stylish one and two bedroom apartments.

Momentum Apartment showcases 8 apartment levels with parking and high-quality retail units on the ground floor. Nestled within Cecil streetscape, it delivers a positive urban lifestyle choice located in close proximity to the CBD, Perth Airport, the Swan River, Carousel Shopping centre and Curtin University.

Read More

Faith Community Church

noni clark

PACT Construction has been awarded the works contract for the Faith Community Church development. Located on a prominent site in Willetton bounded by Roe Highway, South Street and Vahland Avenue, the project will see the existing site subdivided into one super-lot for the church building, 41 residential lots and two public open space lots.

Once finished, the new church building will comprise a 1400-seat auditorium, 400-seat multi-purpose hall and 200-seat multi-purpose hall, as well as backstage facilities, music practice rooms and loading dock, foyer, café / food preparation area, ablutions and classrooms, as well as a 185-bay undercroft car park, 315-bay on-grade car park, office space, ground level access, vehicle ramp, administration office and landscaping.

Read More

McNabb Loop Retirement Village

noni clark

PACT Construction’s credentials for delivering aged care facilities has elevated even further after completing Berrington Properties’ $17.4 million McNabb Loop project.

Designed by Gary Batt & Associates Architects, the new aged care facility on McNabb Loop delivered Como an outstanding facility for elderly residents, including 99 bedrooms, amenity areas, offices, kitchens, and laundries.

Read More

Riverview Church Stage 2

noni clark

After successfully completing Stage 1 of the Riverview Church project, PACT Construction’s proven ability to go above and beyond to meet any challenge resulted in PACT being awarded the job.

PACT undertook the demolition of existing structures on the site and the refurbishment of the existing church building, which included the addition of a new roof cover and service installations.

Read More

Amaroo Village

noni clark

The development involved constructing a new two-storey building that is linked to the existing aged-care facility. The new building comprises 74 rooms, including bedrooms and ensuites, new physio and activity area, residents’ lounge, laundry, kitchen, hairdresser and staff training hub.

Read More

Song School

Louise Mazanec

The final piece of Perth’s Cathedral Heritage Precinct puzzle is in place with the completion of The Song School project.

Situated within extremely limited space between four existing buildings (three of which are heritage listed), The Song School building required modern construction to create a structure that reflects the existing Cathedral’s lancet windows and blends seamlessly with the surrounding 140 year-old architecture. Now completed, the new two-storey, partly subterranean concrete and glass structure will service the choir of St George’s Cathedral and the Anglican Diocese of Perth.

The client has enjoyed an array of benefits stemming from PACT’s comprehensive value engineering process and early involvement during the design stage.

Read More

Australis Apartments

Louise Mazanec

PACT Construction has been awarded the contract for the Australis Apartments development for Adventist Aged Care Group. The project will see a number of existing and outdated residential care facilities demolished to make way for the construction of a new multi-storey residential tower designed by the renowned Hames Sharley Architects.

Read More

Ernest Johnson Reserve

troy barbitta

The reserve is situated in a prime South Perth location bounded by South Terrace, Sandgate Street and Hensman Street. Once completed, PACT will have delivered a contemporary 4 Star Greenstar rated multi-purpose facility that accommodates the needs of sports clubs, community groups, the local community and the City.

Read More

Willetton Senior High School

noni clark

Originally constructed in the 1970s, Willetton SHS was in dire need of modern refurbishments to bring it into the 21st century. Stage 2 of the project requires PACT to deliver a new, fully integrated two-storey building and associated single-storey facilities, complemented by extensive landscaping works and all new car parking.

Read More

Camilla Residences

noni clark

PACT Construction has teamed up with Baltinas Architecture and Cameron Chisholm Nicol to deliver a landmark private residential project – Camilla Residences.

Featuring 19 apartments and two exclusive penthouses over nine levels in a coveted Mount Street location, PACT will draw on its highly successful whole-of-project approach to achieve this outstanding inner city architectural statement. Once completed, the Camilla Residences development will deliver Perth a striking, innovative building located on the edge of Kings Park, with breathtaking views over the city foreshore and famous Swan River.

Read More

Methodist Ladies College - Re-development

noni clark

PACT will oversee the refurbishment of existing facilities at MLC Junior School, including one of its original buildings – the heritage listed Barclay House Administration Building. PACT will also be relied on to construct modern new facilities and incorporate extensive landscaping. This will deliver MLC JS unique playground equipment, from interactive water courses, to in-ground cubby holes, climbing domes and labyrinths, talking tubes, a balancing bridge and a mega chute slide.

Read More