PRACTICAL COMPLETION: Horizon at Rossmoyne Waters
We are thrilled to announce Practical Completion of the main buildings at Horizon Rossmoyne Waters project, in…
PACT was responsible for constructing a new two-level building on the block adjacent to the company’s existing manufacturing facility. We took on a design and construct role in partnership with design firm Meyer Shircore and Associates. The innovative, environmentally sensitive design comprises a 1,118m² warehouse / factory facility, with office and showroom facilities incorporated into the front building. It was developed by ABN Group and designed by Meyer Shircore Architects.
This development comprised of a heavy-duty slab-on-ground, structural steel portal frame, tilt concrete panels and steel framed, metal corrugated wall spandrels.
Polycarbonate roof sheeting provides an abundance of natural light to the factory floor, complemented by energy-efficient LED high bay lighting. Roof vents offer extensive natural ventilation, while a large evaporative air-conditioning system is on standby to cool the factory floor.
We are thrilled to announce Practical Completion of the main buildings at Horizon Rossmoyne Waters project, in…
We are thrilled to announce we have been recognised with two awards at the 2024 Master…