Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Unit 4, 12 Cowcher Place, Belmont
Western Australia
Australia

(08) 9340 590

PACT offers a full range of design, construction and project management services for multi-level commercial and residential projects. A 'whole of project' service, including managing the documentation of the project brief, creating project concepts, setting budgets against project concepts to set feasibility outcomes, ensuring initial design briefs and feasibilities are met, and of course delivering the project.

Kellerberrin Sports & Recreation Centre

Projects

Kellerberrin Sports & Recreation Centre

troy barbitta

Address: Connelly Street, Kellerberrin, WA 6140
Project Value: $4.8 million
Construction time: 38 weeks
Architect: Urbanize Architect

200km east of Perth, Stage 1 of the Recreation Centre has been completed for the shire of Kellerberrin. The $4.8 million stage 1 contract was for the 1,755m2 main building overlooking the existing trots track and football field; and incorporated  a Judges’ box on level 2 of “The Tower” The ground floor if 1,675m2 and consists of a bar/club room with outdoor Terrace and Crech with outdoor Play Area, Kitchen & Family Dining, Tote, Offices with Board and Meeting Rooms, a Gymnasium and a Sports’ Equipment Storage.

Predominate  construction feature included a structural steel frame with concrete ground slab, infill brick work, a flat roof hidden behind parapet walls, and high quality finishes throughout. The project has been constructed in accordance with BCA’s Section J requirements and, now it has been completed, gives the shire a first class facility in the heart of WA’s wheatbelt.

Stage 2 is due for tender in 2012 and included a squash court with viewing are, an indoor sports hall, further change rooms, two outdoor multi-sport hard courts, and enough car parking for over 120 patrons. Lawn bowls and a hockey field cum tennis courts will complete the complex which has been in the pipeline for the shire and the people of Kellerberrin for almost 25 years.